Reading the result
- Variable costs above the static budget aren't a problem in themselves if volume rose; compare them with the flexible budget.
- A small total can hide large offsetting pieces, as in the example.
- The flexible budget uses budgeted rates. Using actual prices or costs in it would push those differences into the volume variance.
- Variances point to who should explain them. The volume variance usually belongs to sales and demand; price and spending variances belong to whoever sets prices or controls the costs.
- For a cost that doesn't move with volume, such as rent or insurance, the static and flexible budgets are the same, so the whole variance is spending.