Finance Brain
Sign in
← Back to decks
Sign in to save your progress.Sign in

Static and Flexible Budget Variances

A budget is a plan; the variance is how far actual results landed from it. This lesson covers labelling variances as favorable or unfavorable, why a static budget can mislead when volume changes, and how a flexible budget splits the gap into a volume effect and a price and spending effect.

7 cards
Study this deck

Static and Flexible Budget Variances

In this lesson · 5 sections
Step 3 of 5

Worked example

An event caterer budgeted 400 events at an average price of 2,500, variable costs of 1,400 an event and fixed costs of 300,000. It actually catered 440 events.

Static budgetFlexible budgetActual
Events400440440
Revenue1,000,0001,100,0001,078,000
Variable costs560,000616,000638,000
Fixed costs300,000300,000312,000
Operating income140,000184,000128,000
  • Static budget variance: 128,000 - 140,000 = 12,000 unfavorable.
  • Sales-volume variance: 184,000 - 140,000 = 44,000 favorable. Forty more events at a budgeted margin of 1,100 each.
  • Flexible-budget variance: 128,000 - 184,000 = 56,000 unfavorable, made up of revenue 22,000 unfavorable (an average price of 2,450), variable costs 22,000 unfavorable (1,450 an event) and fixed costs 12,000 unfavorable.

The static comparison says the caterer missed its profit target by 12,000. The flexible budget shows that strong volume hid weak pricing and cost control.