Over-Time Revenue and Measuring Progress

Once an obligation qualifies for over-time recognition, the work is measuring how far along it is. This lesson tests the three over-time criteria more closely, compares output and input methods, adjusts cost-to-cost for costs that don't show progress, and recognizes losses on contracts.

10 cards
Study this deck

Over-Time Revenue and Measuring Progress

In this lesson · 5 sections
Step 4 of 5

Loss contracts

ASC 606 has no onerous-contract rule, so construction-type and production-type contracts in the scope of ASC 605-35 keep their own: when expected costs exceed the consideration expected (measured by ASC 606's price rules but without the constraint, and adjusted for credit risk), the entire loss is recognized as soon as it becomes evident. The test is at the contract level (contracts combined under ASC 606 are tested as one unit), or by performance obligation as a policy election applied consistently to similar contracts (ASU 2016-20).

Example: a 5,000,000 contract reports 300,000 of profit in Year 1 (costs 1,200,000 of 4,000,000 expected). In Year 2, costs to date reach 3,120,000 and total expected costs rise to 5,200,000, a 200,000 loss. Year 2 reports a 500,000 loss: the 300,000 already recognized plus the 200,000. Revenue is 60% x 5,000,000 - 1,500,000 = 1,500,000, costs incurred are 1,920,000, and a provision of 80,000 covers the loss on the remaining work (2,000,000 of revenue against 2,080,000 of costs).